links

15,707 listings in 197 categories

Details

Valle Nevado

Website
Valle Nevado
Visit Website
Description Development of the Master Plan begins. Two new lifts are installed: a double chairlift at Ballicas and a surface lift at the Valle del Inca peak, opening 5 new runs. A new day visitor parking lot is established, with 350 parking space and ski rental, ski school and ticket booths. The restaurants La Fourchette and the Hotel Valle Nevado are renovated.
Rating
0/5 based on 0 votes.
Ownership davestravel2
Views 88 views. Averaging 0 views per day.
Submission Date Jul 22, 2012